Monday, June 04, 2012

Gates High School Special Use Permit Approved

The Hearing Master has approved the Special Use Permit 12-0429 for the Learning Gate / Gates High School. Full details are below.

Conclusions of Law
Based upon the testimony received, the evidence submitted, a review of the Development Services Department case file, the staff report of the Development Services Department, and a review of the Land Development Code, it is concluded that the Special Use is supportable and that the charter school expansion is appropriate for the subject location.

It is concluded that the applicant has satisfied the requirements of the Land Development Code for approval of the Special Use Permit.

Decision
Approved with conditions as recommended by Development Services Department staff as amended at the hearing. and as conditioned below:

The Sunset Lane driveway shall be limited to right-in, right-out and left-out turning movements only. The access connection shall be designed and constructed by the developer to physically prohibit eastbound to northbound left turn movements into the school site. The developer shall design and construct a westbound right turn lane on Sunset Lane into the site.

If available, the site shall be served by public wastewater service. Hillsborough County shall determine the availability of waste water service in accordance with existing availability determination procedures. If waste water service is not available and septic tanks are to be used, septic tanks shall only be located outside the WRPA Zone 2 boundaries.


Gates High School Hearing Decision

No comments: